Built below. Connected beyond.

Underground data centers, carrier-neutral interconnection and sovereign cloud — engineered for organisations that can't afford to go dark.

Right now at North Ridge

NR1 · Power draw Last 24 h

11.8 MW 84%

Off-grid autonomy 96 h On-site generation and fuel at every campus
42 MWlive IT capacity
99.999%power & cooling uptime
280+networks & carriers
−36 mbelow the surface
Keep descending0 m → −36 m

Trusted by the teams that run what can't stop

  • Meridia Bank
  • Halcyon Insurance
  • Atlas Rail
  • Orbit Telecom
  • Quanta Research
  • Corvex Logistics
  • Novaline Health
  • Lumen Retail

One platform.
Five layers.

Start with a single rack or a 10 MW suite. Add networks, cloud and recovery as you grow — all inside one secured perimeter.

All solutions
Server rack glowing with blue status lights
01

Colocation

Racks, cages and private suites in hardened underground halls. Your hardware — our power, cooling and security.

  • Rack, cage or suite
  • 2N power
  • N+1 cooling
Explore colocation
Blue and violet fibre cables plugged into a patch panel
02

Interconnection

Private links to carriers, public clouds and four subsea cables — without touching the public internet.

1,200+live cross-connects
< 1 msbetween campuses
03

Sovereign Cloud

  • Zone A · Valley99.99%
  • Zone B · Valley99.99%
  • Zone C · North Ridge99.99%
04

Resilience

Recovery time from 15 min Tested failover between campuses
05 AI & HPC High-density, liquid-cooled capacity and GPUs on demand. Descend to −36 m
Tunnel carved through rock, lit by warm lamps, leading to a data hall door Bedrock · 24 m down
Rock temperature, all year18 °C Natural free cooling
PUE 1.32

The safest place for data is under 30 metres of rock.

  • Shielded by nature

    Protection from blasts, fire, heat and electromagnetic interference.

  • Power that outlasts the grid

    Two independent grid feeds, 2N UPS and on-site generation behind every hall.

  • Sovereign by design

    Your data stays in-country, under local law, run by vetted engineers.

  • Connected at the shoreline

    Our Harbor campus is where the region's subsea cables come ashore. Your traffic starts at the source.

Five campuses.
One connected fabric.

Geographically dispersed for resilience, linked by private dark fibre for near-zero latency.

Compare all campuses
Round trip between campuses 0.42 ms Updated --:--:-- UTC
▲ 540▲ 186 MEDITERRANEAN 4 SUBSEA SYSTEMS HB1NR1CT1VL1AR1 020 KM N
Live Construction Dark fibre Subsea cable

Built for regulated,
critical and ambitious.

Banking-grade means always on.

Meet central-bank residency rules and keep trading systems online through any outage.

Solutions for finance
  • Data residency compliance
  • Active-active across campuses
  • Ransomware recovery in minutes

Seven layers of security. Twelve certifications. Zero shortcuts.

Independently audited every year. Every certificate is public — so your auditors can check, not just trust.

  • ISO 27001Information security
  • ISO 27017Cloud security
  • ISO 27018Cloud privacy
  • ISO 27799Health data security
  • ISO 22301Business continuity
  • ISO 9001Quality management
  • ISO 14001Environmental management
  • ISO 45001Health & safety
  • SOC 2 Type IIService controls audit
  • PCI DSSCard payment security
  • GDPREU data protection
  • Critical InfraNational designation

Don't take our word for it.

“We moved our core banking platform in a single weekend. Eighteen months later, we still haven't had a minute of downtime.”
Daniel AradCIO, Meridia Bank
▶ Watch the story · 2:14
“What sold us wasn't the concrete. It was the engineers who picked up the phone at 3 a.m.”
Maya KorenVP Infrastructure, Corvex Logistics
“Our research cluster needed 50 kW racks yesterday. STRATUM had them live in nine weeks.”
Dr. Eitan RosenHead of Computing, Quanta Research

Ready for the density AI demands.

Most data centers were built for office servers. Arava is built for dense GPU clusters — direct-to-chip liquid cooling, solar power on site and room to grow.

80 kWper rack
60 MWAI campus
1.15design PUE
Arava · AR1Building
Construction34%
Ready for service · Q2 2028

See it from the inside.

Walk the halls, meet the engineers and check every spec yourself. Tours run weekly at North Ridge and Harbor.

We'll reply within one business day. No sales spam.